Wednesday 27 November 2013

Rig Progress (darren)



Here is a quick post showing the small amount of progress made on the rig this week. The majority of time has been spent making sure the joint orientations are correct that X is aiming down the joints and Y is aiming up from the direction of X. The aim being to have the entire joint system at least generated by Friday with some indication of control curves applied to the joints too





No comments:

Post a Comment